UNBOX PH

DOTr, SMC Approve 417-km Bicol Expressway

The long awaited expressway from Metro Manila to Bicol is finally official, after the Department of Transportation (DOTr) signed on Friday, June 3, the Supplemental Toll Operations Agreement (STOA) for the South Luzon Expressway Toll Road 5 (SLEX TR5) with the San Miguel Corporation (SMC).

 

DOTr, SMC Approve 417-km Bicol Expressway

The said expressway will  start at the South Luzon Expressway TR4 Project in Barangay Mayao in Lucena City and will end near the Matnog Ferry Port in Sorsogon. It will be a 4-lane divided toll road with 28 interchanges. It will also have eight segments which will run parallel to the existing Philippine National Railway, Maharlika Highway and Padre Burgos National Road or Quirino Highway:

“The SLEX TR5 will connect the Provinces of Quezon and Bicol. It is also expected to provide better and safer access to tourism destinations, ro-ro ports, and fish ports in the two provinces and address traffic congestion in the Bicol Region,” said Tugade.

The SLEX Toll Road 5 is under a joint venture of the San Miguel Holdings Corporation (SHMC) and the Philippine National Construction Corporation (PNCC).

Exit mobile version